Commercial

BestStarts Cameron Road, Tauranga 20/6/2026

Commercial Flooring Project – BestStart, Cameron Road

We recently completed this commercial flooring project at the BestStart office on Cameron Road, transforming the staff bathrooms, toilets, and staff room with a durable and practical flooring solution designed for a busy workplace environment.

Working closely alongside the project management team, our installers, and other trades on site, we carefully coordinated the project to ensure all work was completed within the required timeframe while maintaining a high standard of workmanship throughout.

The client selected a semi-commercial vinyl flooring product that provided the ideal balance between durability, functionality, and aesthetics. The chosen flooring complemented the overall look of the space while being well suited to the daily demands of a high-traffic commercial environment.

The project involved the complete uplift and disposal of the existing flooring, followed by extensive floor preparation where required. To meet the hygiene and durability requirements of the wet areas, full coved skirting and capping trims were installed throughout the staff bathrooms and toilet areas, creating a seamless finish that is easy to maintain and clean.

Scope of Works

  • Uplift and disposal of existing flooring
  • Subfloor preparation and grinding where required
  • Supply and installation of semi-commercial vinyl flooring
  • Installation to staff bathrooms, toilets, and staff room
  • Full coved skirting installation
  • Installation of capping trims
  • Coordination with project management and multiple trades
  • Site clean-up and final detailing

Project Highlights

Commercial flooring projects often require careful planning and communication to ensure multiple trades can work efficiently within the same space. Through close collaboration with the project management team and contractors on site, we were able to deliver the project on schedule while maintaining minimal disruption to ongoing operations.

The finished result provides BestStart with a durable, hygienic, and low-maintenance flooring solution that is well suited to the daily demands of a busy educational and office environment.

Project Information

Client

BestStarts

Location

Tauranga

Project Size

120sqm

Project Value

10 - 15k

Connect to Get Quote

admin@floorical.co.nz
07-9751037
Get A Quote

What We Did

For this commercial flooring project at BestStart Cameron Road, our team completed the uplift and disposal of the existing flooring throughout the staff bathrooms, toilets, and staff room.

Working closely with the project management team, we carefully coordinated our installation programme around other trades on site to ensure the project remained on schedule and disruption was kept to a minimum.

Following the removal of the existing flooring, the subfloor was prepared and made ready for the new installation. We then supplied and installed the selected semi-commercial vinyl flooring, chosen by the client for its durability, practicality, and modern appearance.

To meet the requirements of these wet and high-use areas, we installed full coved skirting and capping trims throughout the bathrooms and toilet facilities. This created a seamless and hygienic finish while improving long-term durability and ease of maintenance.

Throughout the project, communication between our team, project management, and other contractors was key to ensuring each stage flowed smoothly. By working collaboratively and maintaining a flexible approach, we were able to complete the installation within the required timeframe while delivering a high-quality finish.

The completed flooring provides BestStart with a practical, low-maintenance, and professional flooring solution that is well suited to the demands of a busy commercial environment.

Challenges & Solutions

One of the key challenges on this project was working around the office's operating hours and ensuring minimal disruption to BestStart staff throughout the installation process.

As the staff facilities remained in regular use, careful planning and communication were required to coordinate access to the bathrooms, toilets, and staff room. Our team worked closely with the project management team and site staff to schedule works at appropriate times and sequence the installation to keep facilities accessible wherever possible.

With multiple trades working within the same areas, maintaining flexibility and communication was essential. By coordinating closely with other contractors on site, we were able to keep the project progressing smoothly while meeting the required programme deadlines.

Through careful planning, teamwork, and a proactive approach, we successfully delivered the project within the required timeframe while minimising disruption to the day-to-day operations of the BestStart team.