Renovations are where floor levels, old adhesive and three different existing floors all meet. This combination is chosen so a single product runs wall to wall across the open plan, and so the prep gets dealt with properly rather than hidden under a plank.
Book a free measureGround floor, wall to wall
Kingswood 1.5 hybrid plank, 1500 x 182mm
from $59/m²
supplied, incl GST
Step up
European Ash engineered timber
from $102/m²
supplied, incl GST
Bedrooms, if you're keeping carpet
Galaxy2 6.8kg (55oz) Nylon6 carpet
from $35/m²
supplied, incl GST
Supply only. Install, uplift and prep are quoted after we measure. On a renovation the existing floor drives the uplift price, so we ask what's down there before we quote.
Uplift and disposal of the existing floor, priced to what is actually there
Furniture shift room by room, so you can keep living in the house
Levelling, feather finish, grinding or a moisture barrier as the subfloor needs
Undercutting door jambs so the floor runs under, not up against
Ramping where old and new floor levels don't match
A floating floor cannot go over another floating floor. If you have existing laminate or floating timber, uplift is mandatory, and we'll tell you that up front rather than find it on install day.
Uplift cost swings enormously with how the old floor is fixed. A floating floor lifts easily, glued timber is a different job entirely, and on a forty square metre area that difference can run to thousands. It's the first thing we check.
Long format planks read as one continuous floor across an open plan, which is the whole point of opening it up in the first place.
Before and after · open plan renovation · suburb · m² · days on site
Add a review here from a renovation client, ideally one that mentions timing or how tidy the site was kept.
Name · suburb · Google review
Around three days on site for a straight install at roughly 40 m²
Add about a day for uplift and disposal of the existing floor
Add more if the subfloor needs levelling, since compounds have to cure before we lay
If you're running other trades, tell us the sequence and we'll fit around them
Yes, and it's usually the right call. Hybrid is waterproof, so it handles a kitchen and a laundry without a transition strip breaking up the run. A continuous floor also makes an open plan area read considerably bigger than one chopped into zones.
Late. After the painting, after the kitchen, after anything that involves ladders or wet trades. Going in early means covering the new floor for weeks and hoping nothing gets dropped on it. Talk to us about where we sit in your programme and we'll book accordingly.
It's common in older Bay of Plenty homes and it's fixable. We measure the fall, then quote levelling to suit. What we won't do is lay over it and let the floor telegraph every dip, because that shows up within a year and there's no fixing it afterwards.
On concrete we recommend glued. It's quieter underfoot and it feels more solid, which matters if you've spent money on European timber. Floating is cheaper to install and is the right answer over some substrates. We advise per job rather than per preference.
Yes, uplift and disposal are part of the install quote. What we need from you before we price it is what the existing floor is and how it's fixed down, because that single answer moves the number more than anything else on the job.
That's what the mobile showroom is for. Timber and hybrid both read very differently under a shop light than they do in a north facing living room at four in the afternoon. We bring the samples to the house so you're choosing in the room they're going in.
Tell us the address and what you're opening up. We'll bring the samples to you, measure it properly, check the subfloor, and come back with a number you can rely on.
Book a free measureAll from-prices are supply only, per square metre, incl GST, based on current supplier pricing and a ten percent material allowance for cutting and boxed quantities. Installation, uplift, prep, trims, stairs and access are quoted separately once we've measured. Floorical supplies and installs across Tauranga, Mount Maunganui, Papamoa and Te Puke.